Abstract

Electronic data capture (EDC) has emerged as a proven tool for sponsors of clinical trials. Understanding the principles of EDC is more important than ever for clinical data management (CDM) professionals. This chapter reviews the regulations and guidance that currently apply to EDC during pre-production and study start-up, and emphasizes the important role that CDM professionals have in the adoption, development, and improvement of EDC systems.

Introduction

Electronic data management for research emerged in the 1970s and has evolved into a suite of processes and tools to enhance the management, quality control, quality assurance, and archiving of clinical trial research data. In the 1990s the development of electronic data capture (EDC) tools for clinical trials research became more focused. Today, EDC is gaining in popularity, and regulatory agencies are readily accepting submissions in which validated EDC tools are used. EDC systems should be more than just a means to an end and quality EDC systems can be drivers of the entire clinical trial’s information management process. Data managers provide significant value in designing processes to make the transition from paper systems to EDC systems efficient while ensuring data integrity is maintained.

The return on investment has been proven for the automation of clinical trials information management processes from data entry through the summarization and archival processes. Although remote data entry (RDE) processes emerged in the 1970s,1 these processes languished for 20 years without significantly impacting clinical trials. By the mid-1980s, personal computers (PCs) were introduced to clinical trials for clinical data capture, which led to a major transformation in the way clinical data was captured. Prior to that time, site professionals collected data on paper case report forms (CRFs) and sent the forms to a centralized sponsor facility where data computerization took place. This method of data capture was called “centralized” because data was entered into a computer system in a single facility by professional data entry staff. The investigators’ main responsibilities were the original completion of the paper CRFs and responding to queries that arose following review of computerized data.

Having PCs at the investigator site allowed for the introduction of “decentralized” clinical data capture, which became known as remote data entry (RDE). This development began a paradigm shift in clinical trial conduct, placing the responsibility for electronic data entry on site staff. Many sponsors developed proprietary hardware and software solutions to manage RDE at investigator sites. Computerized data was routinely transferred from each investigator site to the sponsor through some type of periodic file transfer, for example, using file transfer protocol (FTP). The FTP process was usually done via phone lines and took some time to complete, depending on the volume of data to transfer.

In the late 1990s, Web-based approaches to clinical data capture were introduced in an effort to gain efficiencies that other industries had realized by moving processes to the Internet. The acronym RDE was subsequently replaced by EDC as data transfer was expedited by Internet technologies rather than FTP, resulting in more frequent and rapid data transfers.5 The introduction of Web-based EDC led to greatly expanded use of decentralized clinical data capture.

Scope

This chapter provides information on the concepts and start-up activities related to EDC systems for companies who are considering transferring some or all processes from traditional paper data collection to EDC. It concentrates on establishing an environment conducive to incorporating EDC technologies into the clinical trial process from the viewpoint of data management. Practices, procedures, and recommendations are proposed for data managers to prepare for and start an EDC system that will properly align electronic data capture technology to support statistical and medical research needs.

Comparisons between paper data collection methods and EDC are also presented. The primary focus in this chapter is on start-up activities to support EDC for electronic CRFs (sometimes called eCRFs, although the term will not be used in this document) and data integration with non-CRF data.

Many of the tasks described in this chapter may be joint responsibilities between different groups, just as there may be many different groups involved in the implementation of various tasks. However, clinical data managers need to be conscious of whether or not these tasks have in fact been performed in a satisfactory manner.

Recommendations for proper study conduct and study closeout using EDC will be addressed in the chapters entitled “Electronic Data Capture—Study Conduct” and “Electronic Data Capture—Study Closeout.” Recommendations for patient diaries and interactive voice response systems (IVRS) will be addressed in future chapters of the GCDMP.

Minimum Standards

Best Practices

Differences Between EDC and Paper-based Studies

Four important areas that differ between EDC and paper-based studies are the manner in which data will be collected, the timeline necessary to prepare for the study, the manner in which collected data will be verified, and disaster recovery planning.

Offline vs. Online vs. Hybrid Studies

The three primary modes of capturing data for a study are:

The mode chosen is generally dependent upon the capabilities and limitations of the sponsor and EDC software used, as well as of sites that will participate in the study. Therefore analysis and planning are essential to determine which mode should be used for a given study.

EDC solutions are inherently technical implementations that vary in their degree of complexity and level of competence required by users. The EDC process extends data collection (and in some situations, data cleaning) to the site and/or subject. It is critical to accurately assess the ability of sites to use and manage the technology on which the EDC application is based. If it is apparent that a one or more sites lack the requisite technical capabilities to use an EDC solution, the sponsor should consider a paper-based or hybrid study as an alternative.

The results of the following assessment examples, as well as any others that are pertinent to the sponsor, will guide the determination of which data collection mode is best suited to a study.

Study Development and Start-up Timelines

Because the study database should become active upon enrollment of the first subject, study start-up is critical for EDC studies. For those working at the sponsor facility, many start-up activities may only need to be performed when EDC is initially adopted. Many of the typical CDM start-up activities for both paper-based and EDC studies include: protocol approval, CRF design, CRF annotation, edit-check specification, user acceptance testing (UAT), and documentation preparation. The differences in CDM start-up timelines for EDC studies are based largely on the increased number of tasks that must be completed before the study may begin. In addition to typical start-up activities, several additional activities may need to be considered for EDC that could impact study development and start-up timelines, including:

With these CDM start-up activities for EDC, it is important to remember that these activities are highly cross-functional.

Source Document Verification (SDV)

The FDA has issued requirements for electronic records and signatures in 21 CFR Part 11, which provides criteria for considering electronic records as equivalent to paper records and electronic signatures as equivalent to handwritten signatures. Determining the level or amount of SDV is not within the scope of DM, however, it is important to determine if the SDV process impacts the database in any way. In principal, conducting source data verification (SDV) on electronic records is the same as for paper records. Electronic records, like paper records, must be accurate, original, legible, attributable, and contemporaneous. It is important to determine how SDV processes will function before the start of an EDC study so the database can be configured to support access, workflows and reporting requirements. Validation of computerized systems is a completely different, but very important, aspect of electronic records that must be fulfilled as well.2 Some systems will allow different SDV strategies and some will not. This needs to be agreed upon up front in case any study specific configuration is required.

The ICH Harmonised Tripartite Guidelines for Good Clinical Practice, the WHO Guidelines for Good Clinical Practice for Trials on Pharmaceutical Products, and the Code of Federal Regulations require that source data verification must occur for all clinical trials in phases I–IV. An evaluation of the conformity of data presented in CRFs with source data, SDV is conducted to ensure data collected are reliable and allow reconstruction and evaluation of the study. The SDV responsibilities of the principal investigator, sub- investigator, study coordinator, monitor, quality assurance auditor, and the clinical trial manager must be made clear at the outset of the clinical trial, and adequate training should be provided to all staff involved. So there are no misunderstandings or errors when SDV is undertaken, special emphasis should be placed on confidentiality and direct access to data. All staff involved must realize that SDV adds to the scientific and ethical integrity of a clinical trial.1, 3 Records of what was done and found, including an evaluation of findings, must be made in the same way as for any other aspect of the trial.4, 5

In the SDV process, information reported by an investigator is compared with the original records to ensure that it is complete, accurate, and valid. Strictly speaking, every item of data that appears in a CRF should be documented somewhere else to allow verification, audit, and reconstruction. The main objective of SDV is to confirm that the information collected during a clinical study is complete, accurate, reliable, and verifiable so as to give confidence to the sponsor and the regulatory authorities in the data being used to support a marketing application. SDV is also required to provide confidence in any data reported, for example, in published manuscripts and at scientific conferences. Without SDV or stringently controlled electronic source data collection methods, no scientist can have confidence in the data presented and in the conclusions derived.4, 5

All information in original records of clinical findings and in certified copies of original records are necessary for the reconstruction and evaluation of the trial. These records may include hospital records, clinical and office charts, laboratory notes, memoranda, subjects’ diaries or evaluation checklists, pharmacy dispensing records, recorded data from automated instruments, microfiches, photographic negatives, microfilm or magnetic media, X-rays, subject files, records at the laboratories and at medico-technical departments involved in the clinical trial, observations, and documentation recording activities in the clinical trial. The following data are considered key data in SDV and any gross errors in these data might be detrimental to the scientific and ethical quality of the clinical trial:

Disaster Recovery and Business Continuity Planning

When determining a move to EDC, ensure that your facility and selected vendor has a plan in place for Disaster Recovery. Disaster Recovery Plans (DRP) are very similar between EDC and paper-based trials, but are always a key consideration. In the context of this section, a disaster is an event that significantly disrupts operations, either temporarily or permanently. This event could be due to fire, theft, or a weather-related incident that removes access to data on the servers; the sudden unavailability of key members of internal or external (e.g., vendor) staff; or the EDC vendor becomes insolvent. The goal of an organization’s Disaster Recovery Plan should be to minimize the loss of operational control in the event of a disaster and to restore business activities quickly with minimal disruptions. As no single response pattern is appropriate to all organizations, a DRP should be flexible in its design.

Data management should cooperate with the information technology (IT) department to ensure that a plan is in place for all hardware and software being used to implement the EDC system. The location of all components of an EDC system should be known and documented to ensure that each of these possible points of failure are addressed by the DRP.

A tiered DRP establishes different levels of response for different levels of failure. Examples of tiers, listed by increasing levels of severity, might include the following:

Accompanying the DRP should be a Business Continuity Plan (BCP) that guides continuation of a study during the recovery of failed systems. Depending on the number of EDC vendors and contract research organizations (CROs) used by the sponsor, the BCP may be included in the EDC project’s data management plan, or exist separately as a plan applicable to all EDC projects. The BCP should identify alternative processes in the event the EDC system becomes temporarily or permanently unavailable. For example, a project may revert to faxing paper CRFs and queries. The BCP should also establish the process by which sites will be informed of EDC system downtime, and the alternative method for collecting data while the system is unavailable.

EDC Deployment Considerations

Considerations for deployment of an EDC system should be taken into account at the organization level and used when researching, interviewing and assessing EDC vendors. Considerations for this step in the EDC process fall into three main categories:

Thin Client and Thick Client Technology Comparison

There are several issues to consider when selecting an EDC vendor and client- server application for a clinical trial. A key decision is whether the bulk of the workload will be done on the client (investigational site) computer or on the server. This decision can determine the costs of clients and servers, the robustness and security of the application as a whole, and the flexibility of the design for later modification.

A thick client (also known as a “fat client” or “rich client”) is client software that performs the bulk of data processing operations and does not necessarily rely on the server. For example, a word processing program installed on a personal computer is an example of a thick client. All documents are created and stored on the PC without the need for processing by a server. For study coordinators to perform data entry, the thick-client approach requires software to be downloaded to computers at the investigational sites.

The use of the thick-client approach introduces a number of challenges. In today’s hospital environment, concerns for privacy and security must be considered. Users may not have administrative rights to install software and existing firewalls may block communication with servers. A thick client may require the use of dedicated internet connections and provision of IT hardware. Each installation of the client software requires validation in accordance with 21 CFR Part 11. Thick clients can encounter versioning issues, as users have to connect to the remote server to retrieve software updates, and accurate records must be kept to ensure all users are using the most current, approved version of the client software. Also, if a user must synchronize the client with a central server to submit data, contact may be lost before synchronization is complete, resulting in inconsistencies.

However, advantages of thick clients include the following:

In client-server architecture, a thin client depends primarily on the server for processing activities. For example, thin clients include browser-based EDC platforms that require the user to log on with the combination of a user name and password. Information is entered and stored centrally, and no data are retained on the investigational site’s PC.

There are several advantages to using a thin-client model. The study coordinator does not have to use one specific computer to access and enter data. This capability is especially helpful when staff must share a limited number of PCs. Installation of study-specific software is not required, and centrally managed updates and patches ensure all users have identical client software. Dedicated network connections are no longer considerations, allowing for much greater user flexibility.

Additional advantages of using a thin client include the following:

When using thick clients, the following questions must be addressed prior to implementation:

When using thin clients, the following questions should be addressed prior to implementation:

Application Service Provider (ASP) vs. Technology Transfer

The decision to use either an ASP or technology transfer model of EDC depends largely on the sponsor’s long-term strategy. The determining factors are usually based on the frequency of use of the software (e.g., how many studies for which it will be used) versus the cost of purchasing and maintaining the software.

Application Service Provider

An ASP is essentially a company that offers its software for use by another company at a cost. The software itself is not purchased, only the opportunity to use that software. The vendor retains full ownership of software, and the client pays for it on a “per use” basis. When an organization uses EDC software in the ASP model, the software resides on the vendor’s hardware and under the vendor’s authority. It is accessed by the client through a browser or other client software provided by the vendor.

The incentive for the sponsor to adopt an EDC system that uses the ASP model is that implementing, hosting, and validating software are left to the vendor, as are the issues of upgrading, maintaining, and supporting the software. A risk-based approach should be used to determine the scope and depth of any additional sponsor software validation to be performed. The ASP pricing structure takes all of these issues into consideration, and therefore ASP pricing per study is typically higher than when using a technology or knowledge transfer system.

Some advantages to using an ASP model for an EDC system include:

Some disadvantages to using an ASP model for an EDC system include the following:

Technology Transfer

In a technology transfer scenario, software under one company’s authority is moved to the environment of the sponsor or CRO. Many different levels of technology transfer are possible, ranging from transfer of just the build of a study to transferring all services from a vendor. Alternately, a sponsor or CRO may bring only certain services in-house, such as the help desk and user training. Traditionally, most companies handle building the study but not its hosting. A sponsor determining whether to bring software in-house should consider the following questions:

EDC System Capabilities

Adopting an EDC system offers an opportunity to implement features and functions that enhance operations. To ensure success, software must be qualified and validated, and key features thoughtfully addressed.

Software Qualification and Validation

Because CRFs are used by many end users, the functionality of each CRF should be tested and validated to ensure that data are entered, assessed, cleaned, committed to the study database, extracted and delivered in a known, regular, and repeatable fashion. Issues to consider when planning and executing the validation of an EDC system include the following:

Support of Library Functionality

Library functionality is the ability to reuse forms, fields, edit checks and other functions within EDC software. The ability to reuse pieces of a study for newly developed studies will allow you to gain efficiencies in the design and build process. Choosing a system or developing a process that supports a library of CRF components will greatly enhance the speed at which you can develop studies.

Electronic Investigator Signatures

Prior to creating a study’s process workflow, electronic signature capabilities of the EDC system being considered must be clearly understood. Questions to be answered may include:

The ability to quickly search in this system interface may be particularly useful for CDM and CRAs when ascertaining a site’s completion status at the end of a defined visit, and also at the end of the study.

Electronic CRF Archiving

The method of transferring an electronic CRF to a read-only format for sites to use in the future must be determined. Factor the process for obtaining the CRFs into the contract’s study timelines and expectations. See the chapter entitled “Electronic Data Capture—Study Closeout” for more information.

Export Formats

Export formats as well as restrictions to the availability of exports should be documented. Possible formats for exported data may include the following:

The timing and delivery of exports is important, therefore the process for exporting and delivery of data should be robust and flexible.

Integration

Utilizing EDC has added complexity to data integration needs. Data managers must now understand how data collected or maintained outside an EDC system will be used, who will use it, and for what purpose it will be used. Knowing the answers to these questions will determine the path integration efforts must follow. In the event data integration does not occur as expected, a clearly defined roll-back plan should be established. To ensure project goals are met, the data manager must articulate these needs to technical or IT staff in clear terms. This section discusses considerations for various types of data integration that data managers may encounter during an EDC study.

Clinical Data Management System (CDMS) Integration

Unless a fully integrated EDC or data management solution is being purchased, data managers must consider how an EDC system will integrate with new or existing data management systems. The EDC vendor may be able to help with integration through an add-on component specifically designed to meet the system needs. Some organizations should consider a custom solution that will involve technical and/or IT staff. Integration should encompass data and queries, while avoiding manual transcription of queries into the CDMS when automated edit checks occur in the EDC system.

Integrations should also consider the reporting needs for EDC data. Data from EDC, ePRO, an external vendor or other sources oftentimes must be viewed together to assess data quality. A third party reporting tool may be needed to achieve this, or your organization may need to rely on clinical programming or other support groups to merge data via SAS.

SAS Integration

The data manager, in collaboration with other functions, should decide whether EDC data will be directly integrated into the SASenvironment, or first integrated with a back-end CDMS.

ePRO Integration

If patient reported outcomes will be collected via the Web, an e-diary device, or other data device, data managers should consider where and how data will be integrated with CRF data captured through the EDC system. Many EDC systems can import bulk data from external sources. If data collected using ePRO is of interest to the investigator, it may be worthwhile to upload ePRO data feeds into the EDC system. Integration of external data into the EDC system may also facilitate the archival and submission process by enabling all data to reside in one CRF. Consideration must be given to integrating ePRO data that has the potential to unblind the study.

CTMS Integration

Integration of the EDC system and the CTMS can be a powerful way to gain efficiency in the conduct of clinical trials. Specifically, the data manager may want to integrate user account management. If site staff information is already being captured in the CTMS, this information may be transferred to either a help desk or directly into the EDC system, thereby eliminating manual creation of EDC accounts. Additionally, integration of visit information from the EDC system to the CTMS can facilitate monitoring and tracking of patient enrollment and completed patient visits. In turn, this information can be used to trigger site payments and grants. Integration of EDC with the CTMS also creates an ideal way to consolidate metrics used to assess overall trial performance.

Paper Component Integration

If data is collected using paper CRFs, a method must exist to integrate these data with data collected using the EDC system. In most instances, data collected on paper is integrated into the back-end data management system. In some cases, it may be more appropriate to merge the data using a SAS environment. Several EDC systems now also have the capability of integrating paper data entry into the same EDC database with EDC data.

Laboratory Data Integration

Even if central laboratories are used, it is sometimes helpful to have all or key laboratory parameters available to site staff within the EDC system. The data manager must consider this need with the clinical team. Having all data stored in one database can facilitate more robust edit checks across other CRF data in the EDC system.

External, Non-laboratory Data Integration

If data such as an electrocardiogram will be received from external vendors other than central laboratories, data management should analyze the importance of data integration. As with ePRO integration, if sites require access to this data, the data manager should plan on uploading data into the EDC system. More information on this topic may be provided in other chapters.

Other Important Integrations

As new technological tools are developed constantly, it is important to be mindful of other systems that may need to be integrated with an EDC system. In addition to the integrations discussed above, data managers should be aware of the need to also integrate an EDC system with coding, IVRS, and reporting tools other than SAS.In the future, electronic health records (eHR) may also become an important consideration.

International Study Considerations

EDC systems are routinely used in international studies. The role of data managers in international EDC trials is similar to the role played in paper studies. However, planning is critical if the deployment of CRFs and hardware is to be completed prior to the first site initiation. Data management must work with clinical research to understand language needs of the CRF or any components of the CRF. Issues to consider include the following:

System and Vendor Assessments

For most organizations, moving to EDC is a significant decision, with an effect that is not limited to only data management. When launching an EDC system assessment, stakeholders from different parts of the organization are needed to develop the requirements checklist. Included in the requirements checklist should be:

This list should include a minimum of topics and the priority of each requirement (e.g., necessary or “nice to have”). A suggested method for determining overall requirements for the software and vendor is a grid to which perceived values can be added. Additionally, identifying the availability of alternatives for some requirements may be useful, as selected vendors and software may not meet the requirements precisely.

The suggested list of minimum topics for the vendor/system assessment grid is as follows:

If a vendor is sought for the purpose of securing an engagement for more than one project or product, the grid should also include:

Once developed, the grid can be evaluated to identify company requirements. The following sections will further discuss the requirements listed above.

For more information, see the GCDMP chapter entitled “Vendor Selection and Management.”

Other Considerations

At the point in time that you are still investigating a move to EDC, the following topics should be discussed with your prospective vendors.

Change Control Process

These plans do not need to be fully developed prior to selection of a vendor, but you will want to know and understand that your vendor has a structured, detailed, and documented plan for change control. This includes change control for software upgrades as well as for midstudy amendments. A well developed plan should be in place for both types of change control. For a more detailed discussion of change control processes, see chapter entitled “Electronic Data Capture—Study Conduct”.

Escrow Agreements

Assess if there is a need for your company to have an escrow agreement put in place with your vendor. Some companies offer source code escrow services that assure the Licensee continued availability and usefulness of the software in the event that the software vendor fails to maintain the license agreement, or becomes insolvent.

Related Services: Hosting and Help Desk

A critical factor in the success or failure of an EDC study is the technical support received by users encountering problems with the system. Technical software support is often managed through a help desk. If using an outside vendor, standards and expectations for all trials using the vendor’s help desk software should be documented in the vendor’s contract for this service.

As the EDC market expands, EDC vendors continue to add functionality that makes their solutions unique. However, most vendors offer the services of hosting and help desk. How services are provided and fees for services can be very different among vendors.

The basic questions of how the help desk will be handled needs to be discussed with your team at this stage of deployment. You may consider bringing EDC help desk functions in-house with your organization, or you may prefer to use an outsourced help desk. The outsourced help desk could be facilitated by the EDC vendor you choose, or you could enlist the services of a technical call center or help desk. The sponsor’s decision to use an internal or external help desk is primarily determined by the amount of internal resources available to perform this function and the level of response time or needs that the study or project dictates. For example, if an EDC study is of a very simple design, of short duration, and has a small number of sites, the use of an internal help desk may be the best choice, so long as qualified staff are available to take inbound calls. Internal help desk agents will have a better understanding of the company’s policies, procedures, and protocol design elements. As good service will have a direct impact on their employer and future business with that particular user or site, internal staff will also be more interested in determining the quickest and best way to resolve an issue.

A global study with numerous sites, complicated and varied forms, and new users represents an opposite example. Use of an outside help desk could provide advantages, such as covering additional time zones and languages without taxing internal resources. Moreover, external help desk agents are typically evaluated on performance of help desk ticket resolutions, and will have a vested interest in being courteous to users. However, they will not be able to address clinical-related questions, which will need to be forwarded to internal resources.

Vendor SLAs and Performance Reports

When using an external vendor, the sponsor must emphasize the writing and managing of service level agreements for performance. A contract should be established between the sponsor and vendor providing help desk services (such as the EDC vendor or other outsourced agency). This contract and/or SLA should include, but is not limited to, the following identified functions and associated costs:

Several reports can assist with the management of a help desk, especially an external help desk. These reports include:

The main point to remember at this time is that technical support for end users is crucial to the success of your move to EDC. Ensure that your first level of help desk coverage is available to all users, has enough language coverage to accommodate your sites and that the hours of support are sufficient for your user community.

Detailed Help Desk Planning

Once an EDC vendor is selected, roles and responsibilities of the help desk staff and the sponsor’s staff must be established. Consideration should be given to the number of help desk staff available. The number of studies conducted by the sponsor will determine the number of help desk staff required and indicate whether help desk services should be provided by an external party. If only a small number of studies require support, it may be feasible for the sponsor to provide help desk support with internal staff. The timeframe during which users should be able to contact the help desk must be considered. Typically, 24/7 coverage is not required unless the EDC system is deployed globally. When the help desk is provided by an external organization, service level agreements should be established concerning the timeframe in which each call will be answered, as well as any other metric your organization feels is important.

Software support is commonly separated into different levels or tiers based on the technical expertise needed to correct the issue. Tier 1 software support is the lowest level of support needed and includes activities such as unlocking user accounts and resetting user passwords. Because it is the most common support required by users, tier 1 software support is vital to a study. Users that require this level of support are often unable to access the system in any fashion. Therefore, to minimize the negative impact to both users and study conduct, it is critical to provide assistance to these users as soon as possible.

For various types of anticipated user issues, clear escalation paths must be identified for second and third level support. Data managers frequently serve as the second or third level of help desk support for EDC studies. The most common issues escalated to data managers are trial-specific data entry or query resolution issues. The data manager should be prepared to discuss the problem’s solution with the level one help desk agent or with the user directly. This new role may require multilingual expertise from CDM. This new role also strengthens the relationships between CDM, clinical researchers, and sites. Cooperation among all three parties may be required to solve problems related to the EDC system. To ensure that users are satisfied with the EDC system, CDM should ensure that help desk escalation procedures are followed and working correctly.

Examples of issues and their required level of support include:

Deployment of computer equipment and Internet connections can also be handled by your help desk. However, these services can drain resources in day-to-day operations and involve the complexities of international shipping and tracking.

In addition to the issues listed above, data managers should ensure that specific information is provided for issues concerning account management, tier one software support, and requirements for multilingual capabilities.

Tier-One Software Support

Steps must be taken to ensure that training materials for help desk staff are complete and clearly identify the correct issue-escalation procedures. Ideally, help desk staff should be trained on usage of the EDC system. For each study, data management should provide help desk staff with a document outlining study-specific areas of concern, such as common issues with data entry encountered by users. This document will enable help desk staff handle calls more efficiently and will minimize issues that are escalated to data management.

Tier 1 support may be needed whenever a user attempts to access the EDC system and encounters a problem. Therefore, the support center must be available whenever users will access the system. At a minimum, standard business hours should be represented (e.g., in the United States, 9:00 AM to 5:00 PM), but even determining what standard business hours are for specific users can pose a challenge since sites can be located in different time zones or countries. Another consideration is whether or not support will be available on weekends and holidays. While the gold standard for support availability is 24 hours per day, 7 days a week and 365 days per year (24 x 7 x 365), this ideal may provide significantly more coverage than is needed and unnecessarily increase help desk costs. As with language localization, help desk availability must to be determined prior to the start of the study.

Providing Toll-Free Support

Tier 1 software support most commonly involves individual users contacting a support center or help desk for assistance. To ensure convenient access to technical assistance, users should be provided with a toll free phone number or calling cards to contact the help desk.

Multilingual Capabilities Required

To handle calls in international studies, the help desk staff should be fluent in applicable world languages.

To be effective, the help desk managing tier 1 support must be able to successfully communicate with all system users. Clinical studies are frequently multilingual and it cannot be assumed that all users will be conversant in English. Several options are available when determining how multiple language needs will be addressed. One option is for the help desk to fully support any and all languages with on-site support staff. Another, more frequently used option, is for the help desk to support several of the more common languages with on-site staff and to make use of a translation service to provide access to translators fluent in languages less likely to be needed. If providing multilingual help desk support is not possible, CDM representatives should discuss this issue with the CRO local to the international site. In many cases, monitoring staff may be fluent in local languages and can handle certain types of support.

Gap Analysis between Existing SOPs and EDC Requirements

It is critical to determine how implementation of an EDC system will require changes in the sponsor’s current set of SOPs and other controlled documentation. Identifying these gaps is an effort of technical and clinical operations that must be shared among all stakeholders.

At a minimum, requirements should be written for each new process that has the potential to impact study data. These requirements must later be tested and will form the basis of validation efforts. Functional requirements must be developed to test overall functionality of the solution, and business requirements must be developed to test how the solution meets needs of the sponsor. Examples of procedures and processes for which requirements, testing, and validation should be performed include data entry, data verification, discrepancy management, data lock, user roles, user security and privileges, data reporting, subject freezing or locking, database backup and recovery (if not covered elsewhere), financial reports, study design of data objects, edit check procedures and derivation procedures.

Requirements for updating SOPs and the study process for EDC include:

Data management may also establish goals for EDC projects based on calculated return-on-investment. However, most organizations will find it necessary to modify their processes to accommodate EDC during the start-up phase. It should be expected that the start-up phase will be iterative and will be impacted by many variables, including:

This transition phase of EDC initiation may be planned through careful selection of the first several projects that will implement the EDC solution. Limiting the number of projects to use EDC will enable the sponsor to transition smoothly into the solution and manage expectations of stakeholders as necessary. Using this model, the sponsor may identify discrete phases of EDC implementation and formulate each phase to increase the complexity of projects using EDC. Ideally, a review step can be established at the end of each phase to inform stakeholders of the structure and expectations of subsequent phases. This review step should include all stakeholders and should analyze how closely the phase met set targets for metrics and performance.

Staffing Evaluation and Staffing Change Plans

Before initiating an EDC trial, a sponsor should carefully compare the resources needed to manage the people, technology, and processes to the resources that are currently available. Any deficiency in resources should not be underestimated. Initiating a trial using EDC without identifying and providing necessary components may result in failure to meet study objectives in terms of time and cost. Moreover, the study team (including the sponsor, contract staff, and site staff) may be negatively affected. To ensure an EDC study is achievable in terms of cost, time, and quality of deliverables, the sponsor must commit to meeting the study’s resource and training needs.

Resources available to the sponsor include staff (and their skill sets), established processes, and vendors. The staffing evaluation plan should analyze the sponsor organization for any gaps between available resources and the resources needed to conduct and manage the EDC study. During this analysis, the following issues should be considered:

After assessing the staffing needs to conduct an EDC trial, the sponsor should evaluate necessary changes, if any, that are needed within the organization. The role of CDM may change from a task manager (managing the data itself) to that of a project manager (facilitating data and communication flow between all other study participants). CRAs may take on more responsibility understanding the technical aspects of data collection, training site staff, and answering questions from site staff about the EDC system. Information technology (IT) and programming resources may also have increased visibility to other study team members, especially during the EDC system configuration, EDC suitability at prospective sites, and/or the help desk communication to resolve user questions.

To facilitate these changes in staffing structure, the sponsor should:

Metrics and Performance Targets

Ideally, performance targets set for EDC projects will be based on the sponsor’s foundational reasons for switching to EDC. These targets should represent the first level objectives for EDC projects. The next set of objectives can be developed during rollout of the EDC solution and should include feedback from all stakeholders.

Data management must also identify any additional metrics that may not be applicable for paper-based studies but that will be needed for EDC projects. Examples of EDC metrics may include average time for discrepancy resolution by site, average number and severity of help desk calls, and percent of EDC system downtime.

For EDC and paper-based studies, sponsors need to determine which metrics reports are required and establish processes for collecting, analyzing, and reporting the metrics data. Decisions need to be made to determine reporting frequency, at which level metrics need to be reported (e.g., by phase of study, by site, by trial, by therapeutic area, by region, etc), and who is responsible for reviewing and assessing data results. All metric reports must be clearly defined, with definitions clearly understood by all individuals reviewing and making decisions about data. These reports should be validated against the sponsor’s computer system policies and procedures, and should be standardized so they can be used for multiple trials.

The following is a list of minimum recommended EDC metric reports:

Reports to Support Study and Process Management

Data are more readily available in studies using an EDC system. This availability is particularly advantageous as it enables the sponsor to be more active in managing data management workflow processes and timelines, as well as site progress and performance. Early data reporting capabilities enable the sponsor to perform more timely assessments and take action to drive productivity, improve site performance, and reduce overall study timelines.

Just as in paper-based trials, creating report and listing specifications should be a collaborative effort between CDM and other members of the research team, especially those responsible for clinical, statistical, and safety-related functions. Report and listing specifications should be documented in a data review or data management plan that clearly indicates who is responsible for reviewing listings and reports. This plan should also clearly indicate the frequency of review and what action may be taken (e.g., creating manual queries, contacting the site, or retraining the site).

Performance targets and goals need to be established at the organizational level and individual study level, as discussed in the previous section devoted to metrics and performance targets. Expectations based on these targets need to be communicated to both the study team (e.g., data managers, monitors) and site staff (e.g., study coordinators, principal investigators) to drive improvements in data management processes, trial timelines, and site performance. Due to the technology differences, metrics goals and expectations for EDC studies can be more aggressive than for paper-based studies. For example, in an EDC study the overall study goals for query turnaround time and subject-visit-date to date-entered-in-system can be shorter and more aggressive. This difference is also true for data-management process metrics. For example, goals for the time from LPV to data lock can be shorter on average in an EDC study than in a paper-based study, because the data can be received, reviewed, and validated in a much more timely fashion.

To ensure efficient data cleanup activities, it is recommended that reports that aid in data cleaning be identified during the pre-production period, as well as reports necessary to gather metrics about study conduct processes. Reports which capture protocol deviations should be programmed at the beginning of the study and run frequently to monitor compliance. Tasks that should be completed include the following:

CDM Deliverables During Study Start-up

The following section concerns CDM deliverables during the start-up phase of an EDC study, including CRFs, edit checks, and coding.

CRFs

In an EDC system, electronic CRFs replace traditional paper CRFs. However, data captured through electronic instruments or computer software is not immediately considered electronic CRF data. CDISC defines an electronic CRF as a CRF in which related data items and their associated comments, notes, and signatures are linked electronically.6

The process for designing CRFs in an EDC system is integral to study start- up. Development of an electronic CRF is more complex than simply modeling a paper CRF in a word processor. Creating an electronic CRF entails designing a truly electronic form with user interface elements that reduce challenges posed by electronic data entry, as well as facilitating data collection to improve data quality. Interface elements such as check boxes, option buttons, and menus enable users to record data less likely to be queried, which is a goal of EDC.

Although organizations such as Clinical Data Interchange Standards Consortium (CDISC) have initiatives underway, such as CDASH, there are currently no widely adopted standards for electronic CRFs, and those standards that do exist are evolving.6 However, as with paper-based CRFs, standardization of electronic CRFs by the sponsor can:

A well-designed EDC system should assist site staff with accurate entry of study data. An EDC system can be designed to guide site staff to appropriate forms and to correctly enter data into the fields of those forms. The design of CRFs should avoid the following shortcomings:

The following practices should be followed during the design of electronic CRFs:

As mentioned previously, standards for electronic CRFs are still developing. Generally, an EDC system should be flexible enough to capture questions as they would appear on a paper CRF. Data management should be dedicated to identifying and maintaining standards for the design and functionality of CRFs to be used in the EDC system. Prior to a study’s production release, a process should be established to ensure that development of CRFs adheres to these standards.

Multilingual CRFs

Even when an EDC system has multilingual capabilities, translation of text appearing on CRFs can be a time-consuming process. Data management should determine whether English is the best language to be used for text appearing on CRFs. Because many studies are already conducted in English, most sites do not object to the use of English for CRFs. However, data management should work with each site to evaluate its multilingual requirements. Translation should be considered for printed and electronic user manuals, as well as training materials supporting the EDC system.

Although users of the EDC system may speak English or have years of English training, they may still misunderstand text that appears on an untranslated CRF. Idioms that may cause confusion or may not translate clearly should be avoided. A medical linguist may be required to translate certain terminology. Ad hoc forms should be presented in the local language of the applicable site. To check the quality of translations, back-translation by a third party should be used.

Dynamic Forms

Dynamic forms appear only when a subject meets a certain criterion, or when a particular data point is entered. A common example of a dynamic form is a form for pregnancy information which only needs to be entered when the patient is female. However, because dynamic forms do not always appear to be available in the EDC system (e.g., the pregnancy form will not appear in the system if a patient is male), they have the potential to confuse users. For example, the sex of a patient might be entered incorrectly as female and subsequently changed to male. In this case, implementation of dynamic forms on the EDC system determines what happens to the pregnancy form and its data, which is no longer needed for the male patient.

Determining how to best implement dynamic forms depends on capabilities of the EDC system and complexity of the study. Clarity with the functionality of dynamic forms can be achieved through the following practices:

Dynamic Visit Structures

Dynamic visits are similar to the dynamic forms discussed in the previous section. However, instead of forms, visits become available based on data entered for a patient. In an oncology trial for example, when a patient meets a certain criterion he or she may move to a different treatment group. Dynamic visits enable this type of capability, and the same best practices should be followed as for the design and implementation of dynamic forms. Dynamics may impact data entry efficiency and system speed, so data managers should be aware of the possibility of overloading sites with confusing or complicated dynamic functionality.

Derived Variables

EDC systems can provide derived variables. This may be helpful for sites, as some data will not need to be entered by site data entry personnel. Some commonly used derived variables would be conversions from one measurement system to another (pounds to kilograms or inches to centimeters) as well as averages or computations from other entered fields.

It is necessary for CDM to communicate how these features work and help users understand the impact on monitoring. This holds true for dynamic forms as well as derived variables.

Edit Checks

The use of edit checks in an EDC system offers data managers a unique opportunity to resolve data issues by interacting directly with clinical site coordinators. Due to the ability to gain access to data shortly after it is entered, data managers and clinical personnel can initiate issue resolutions with site staff in a more timely manner. For example, direct contact by phone with site staff promotes an active approach to completing a CRF and resolving edit check issues. Direct contact with site staff also promotes an active approach to completing a CRF and its edit checks within a short period of time from each other. Moreover, during study development, data managers can truly collaborate with database developers when programming edit checks. The technical nuances can be explained by the database developer, and the data manager can provide necessary data management principles to ensure implementation of a functional edit check.

The approach to programming edit checks should be chosen during development of the EDC database specification, and in consultation with all stakeholders involved in data validation. To define and review edit checks prior to production release of an EDC study, data managers coordinate activities of clinical, IT, quality control, quality assurance, and other groups. This is essential to the correct functioning of edit checks in an EDC system.

Edit Checks in an EDC System versus a Back-end CDMS

The approach to programming edit checks depends on the architecture of the EDC system, which can typically be described as either of the following:

The following considerations concerning the EDC system architecture should also be made in determining the approach to programming edit checks:

In both EDC system architectures (and for paper-based studies as well), consideration must be given to the edit check specification as a whole. However, in an EDC system some issues impact the site user rather than the sponsor. For example:

Hard vs. Soft Edit Checks

In addition to planning where edit checks should be programmed in the architecture of an EDC system, consideration should also be given to potential types of edit checks and corresponding user responses. Edit checks in EDC can be classified into two broad categories, “hard” edits and “soft” edits.

Soft edit checks are usually cross-panel or cross-item rules programmed to allow data to be entered into the system, but checks for consistency upon data entry. If an inconsistent or missing data item is identified by the edit check, a visual indicator (e.g., color change, iconography) indicates that a new query exists and on-screen text prompts site staff to address the query. For soft edit checks to be programmed correctly, the data manager should clearly identify fields on each form for which data must be entered.

Hard edit checks can be classified as “browser” checks or “system” checks.

Coding

Decisions on how to handle coding of medications, adverse events, procedures, and other study data should be included in the specifications documents and in parallel with CRF development. The role of data managers in the coding process for an EDC study should be relatively unchanged from the coding process for a paper-based study. However, the process should be adapted to the technology used to perform coding.

The following best practices for coding on EDC systems should be followed:

Site Evaluation and Qualification

The process for initiating an EDC study is not just a matter of the sponsor selecting an EDC vendor that meets certain business requirements. The sponsor must also consider the pricing model, management, deployment, and implementation of the vendor’s EDC system. The sponsor is responsible for ensuring that sites are assessed and qualified to use hardware and software required by the EDC system. Site evaluation and qualification by the sponsor and EDC vendor must occur during start-up activities and must be seamless, especially when EDC is being implemented at a site for the first time.

The following sections detail criteria for evaluating and qualifying a site’s readiness to implement an EDC system.

Evaluating Site Technical Capabilities

Aspects of the site’s technical capabilities may include the following:

Evaluating Site Connectivity, CRA Connectivity at Sites

Site Provisioning, if Necessary

Site Hardware and Broadband Provisioning if Necessary

Good clinical practices advise that site assessments be completed, including current trends and practices. These assessments are performed to ensure that, prior to study initiation, sites selected for a study are completely prepared to enroll patients. Although site assessments are not required, not assessing a site could be very costly—a site may have qualified patients and learn that they do not have the equipment and/or knowledge to enter patients correctly within an EDC system. Learning this too late would be detrimental to the site, study, and sponsor. Hardware and broadband provisioning can be undertaken by the sponsor, CRO, or can be outsourced to a 3rd party provider that specializes in this area.

End User Preparation

This section concerns activities that should be conducted before the study begins to ensure staff are prepared to use the EDC system.

Setting System Rights Determined by Roles and Privacy

Internet-based access to an EDC system presents additional challenges that must be clearly documented to ensure security and confidentiality of study data. The browser must ensure that all data connections cannot be breached or corrupted by an unauthorized user or external software. All audit trails detailing user access must remain unmodified and intact. User management begins with the sponsor’s evaluation of the roles and responsibilities for each task within the system, based on criteria outlined in staff evaluation plans. Because the EDC system is used by different site staff and sponsor team members, access needs to be considered for all. Where input or review of data is required within the system, user roles and responsibilities should be defined and documented to identify specific access privileges or rights. Factors to be considered when defining these user roles include the following:

User IDs and Passwords

Conventions for user IDs and passwords need to be determined up front in study planning. In addition, processes for dissemination of IDs and passwords to users must be established. These processes should include tracking that users have been properly trained prior to receiving access to the system. The system should force users to change their password at first log-in.

Training or system documentation should educate users as to the rules and regulations on keeping user ID and password information confidential, as well as requirements for changing their passwords. Lastly, the training materials should instruct users on what to do should they lose or forget their ID and/or password.

Account Management

Data management should participate in designing the account management process so they can train clinical staff on how they and their site coordinators will obtain access to the EDC system. The process should minimize the number of manual steps that are included. Consideration should be given to linking the CTMS to the account creation and activation system, thereby eliminating the need to transfer user information between systems.

The typical account activation process is as follows:

  1. A user is trained and authorized to be granted access to the system.

  2. The user calls the help desk to request activation of his or her account.

  3. The help desk confirms that EDC training has been completed by the user.

  4. The help desk creates the account and assigns a temporary password to it.

  5. The help desk guides the user through the process of logging on to the EDC system and selecting a new password.

  6. The user confirms access to the EDC system.

Training Prior to System Access

If study team members and site staff are not fully trained to use the EDC system, they are unlikely to use it properly. Therefore, users must complete required training before being provided access to the EDC system. If possible, a certification exam can be included at the end of training to certify competence. Certification forms should be given to trainees as appropriate.

User training on both the system and study setup within the system is important. There are various views on the extent to which these two components should be included in the training plan. At a minimum, each user with the ability to modify study data should have documented training on basic system functionality, such as logging on, opening a CRF, entering data, and responding to a query. User training can be provided through methods such as the following:

Recommended Standard Operating Procedures




Phạm vi

Chương này cung cấp thông tin về các khái niệm và hoạt động start-up liên quan đến các hệ thống EDC cho các công ty đang cân nhắc chuyển một vài hoặc tất cả các quá trình từ thu thập dữ liệu giấy truyền thống đến EDC. Nó tập trung về việc thiết lập một môi trường thuận lợi cho việc kết hợp các công nghệ EDC vào quá trình thử nghiệm lâm sàng từ khía cạnh của quản lý dữ liệu.Thực hành,thủ tục và khuyến nghị được đề xuất cho các nhà quản lý dữ liệu để chuẩn bị và bắt đầu một hệ thống EDC sẽ sắp xếp đúng dữ liệu điện tử nắm bắt công nghệ để hỗ trợ các nhu cầu nghiên cứu thống kê và y tế. Ngoài ra cũng so sánh giữa nhập liệu bằng giấy và online.Sẽ chủ yếu xoáy vào các hoạt động start-up để hỗ trợ EDC cho việc nhập CRFs điện tử (hay còn gọi là eCRFs mặc dù thuật ngữ này ít sử dụng trong doc này) và cách kết hợp dl với dl non_CRF 

Differences Between EDC and Paper-based Studies

Bốn lĩnh vực quan trọng khác nhau giữa EDC và các nghiên cứu trên giấy là cách thu thập dữ liệu, thời gian cần thiết để chuẩn bị cho nghiên cứu, cách thu thập dữ liệu sẽ được xác minh, và kế hoạch phục hồi thảm họa

Offline vs. Online vs. Hybrid Studies

Có 3 cách chính trong việc thu thập dl là:

Cách được chọn thường phụ thuộc vào khả năng và giới hạn của nhà đầu tư và phần mềm EDC cũng như việc site nào sẽ tham dự vào study này. Ngoài ra kế hoạch và phân thích cũng rất quan trọng để tính toán xem cách nào đc sử dụng vào study

Study Development and Start-up Timelines

Bởi vì cơ sở dữ liệu của nghiên cứu phải linh động khi đăng ký bệnh nhân đầu tiên,nên các hoạt động khởi đầu của nghiên cứu là rất quan trọng cho các nghiên cứu EDC. Đối với những người làm việc tại cơ sở tài trợ, nhiều hoạt động khởi động chỉ có thể được thực hiện khi EDC ban đầu được thông qua.Nhiều hoạt động khởi động CDM điển hình cho cả hai nghiên cứu trên giấy và nghiên cứu EDC bao gồm: phê duyệt protocol, thiết kế CRF, CRFChú thích,đặc tả CRF, người dùng chấp nhận thử nghiệm (UAT), và chuẩn bị tài liệu. Sự khác biệt về thời gian khởi động của CDM đối với các nghiên cứu EDC chủ yếu dựa vào số lượng các nhiệm vụ phải tăng lên hoàn thành trước khi nghiên cứu có thể bắt đầu.Thêm vào các hoạt động thông thường của start up, một số hoạt động bổ sung có thể cần được xem xét cho EDC rằng có thể ảnh hưởng đến sự phát triển của nghiên cứu và thời hạn khởi động, bao gồm:



Với các hoạt động start_up CDM này, nó rất quan trọng để nhớ rằng những hoạt động này có tính xuyên chức năng rất cao

Source Document Verification (SDV) 
FDA đã phát hành các yêu cầu cho các bản ghi và chữ ký điện tử cho 21 CFR part 11. Yêu cầu đó cung cấp các tiêu chí để xem xét các bản ghi điện tử tương đương với bản giấy và chữ ký điện tử so với ký tay. Xác định mức độ và số lượng của SDV không trong phạm vi DM, tuy nhiên, nó rất quan trọng để xác định liệu rằng quá trình SDV có ảnh hưởng đến database dưới bất kỳ hình thức nào ko. Về nguyên tắc, tiến hành xác minh dữ liệu nguồn ở các bản ghi điện tử phải chính xác, nguyên gốc, rõ ràng,attributable, đồng thời.Nó rất quan trọng để xác định quá trình SDV sẽ hoạt động như thế nào trước khi khởi động một nghiên cứu EDC vì thế dl có thể được cấu hình để hỗ trợ truy cập, luồng công việc và báo cáo yêu cầu.Xác nhận của các hệ thống máy tính là hoàn toàn khác nhau nhưng rất quan trọng về mặt các bản ghi điện thử phải được điền thông tin. Một số hệ thống cho phép các chiến lược SDV khác nhau và một số thì không. Điều đó cần phải được thông qua trước bất kỳ cấu hình xác định của study nào đó được yêu cầu. ( This needs to be agreed upon up front in case any study specific configuration is required_dịch lại)

The ICH Harmonised Tripartite Guidelines for Good Clinical Practice, the WHO Guidelines for Good Clinical Practice for Trials on Pharmaceutical Products, and the Code of Federal Regulations yêu cầu SDV phải được xuất hiện trong cất cả các giai đoạn của nghiên cứu I-IV. Một đánh giá về sự phù hợp của dl trong CRFs với dl nguồn, SDV được tiến hành để chắc chắn rằng dl được thu thập là tin tưởng và cho phép xây dựng và đánh giá lại nghiên cứu.Nhiệm vụ của  principal investigator, subinvestigator, study coordinator, monitor, quality assurance auditor, and the clinical trial manager phải được làm rõ ở giai đoạn đầu của nghiên cứu và cần được đào tạo đầy đủ.Vì thế không có chuyện hiểu lầm hay mặc lỗi khi tiến hành SDV...(đoạn này nói rằng người SDV rất quan trọng và phải làm tốt nhất có thể, ko sai sót)

Trong quá trình SDV, thông tin investigator thông báo phải được so sánh với bản gốc để chắc chắn rằng nó đã được hoàn thành, chính xác và hợp lệ. Nói nghiêm túc, tất cả các phần dl trong CRF phải được lưu giữ ở đâu đó để xác minh, xem lại và xây dựng lại. Mục đích chính của SDV là khẳng định những thông tin thu thập trong suốt quá trình nghiên cứu là hoàn thành, chính xác đang tin và được xác thực để nhà tài trợ tự tin và các nhà chức trách sử dụng các thông tin này trong thị trường. SDV cũng yêu cầu để cung cấp thông tin tin cậy vd như nó đc thông báo trong các hội nghị khoa học. Nếu không có SDV hoặc là các phương pháp thu thập thông tin điện tử thì không một nhà khoa học nào có thể tự tin về các dữ liệu hiện có và đưa ra kết luận.

Tất cả các dl dưới đây đều được xem như dl chính trong SDV và bất kỳ 1 sai sót sơ đẳng nào cũng sẽ gây hại cho các nhà khoa học và đạo đức nghiên cứu lâm sàn

Disaster Recovery and Business Continuity Planning → nói về các thiên tai rủi ro thì ta sẽ phải làm gì? tìm hiểu phần này sau

EDC Deployment Considerations (Xem xét về việc triển khai EDC)

Xem xét về việc triển khai hệ thống EDC là của các nhà lãnh đạo, họ phải tìm hiểu, phỏng vấn và tiếp xúc với các nhà cung cấp EDC. Bao gồm ba bước sau:

Thin Client and Thick Client Technology Comparison

Có một số vấn đề cần xem xét khi lựa chọn nhà cung cấp EDC và ứng dụng client server cho một thử nghiệm lâm sàng.Key để quyết định là liệu phần lớn khối lượng công việc sẽ được thực hiện trên máy tính của client (bên giám sát) hoặc trên server. Quyết định này có thể xác định chi phí của client và server, độ mạnh và bảo mật của ứng dụng, tính linh hoạt của thiết kế cho các thông tin chỉnh sửa.

Thick client (hay còn gọi là "fat client" hay là "rich client") là phầm mềm thực hiện 1 gói các hoạt động xử lý dl và không cần hỗ trợ của server. VD cài đặt ctrinh xử lý văn bản trong máy tính cá nhân.Tất cả các tài liệu và lưu trữ trong PC mà không liên quan đến server. Đối với các bên cùng tham gia để nhập thông tin. thick client yêu cầu download phần mềm về máy ở bên site giám sát. 

Bất tiện của thick client là: trong bệnh viện thì vấn đề về bảo mật và riêng tư phải được xem xét. Người dùng không có quyền để cài đặt phần mềm và firewall có sẵn trong máy có thể block các liên lạc với server. Một thick client có thể yêu cầu 1 internet chuyên biệt và dưới sự giám sát của IT. Mỗi thay đổi của client software phải yêu cầu xác minh tương ứng với 21 CRF part 11. Thick client có thể gặp phải vấn đề về nâng cấp, người dùng phải kết nối với remote server để nhận bản nâng cấp và các bản ghi chính xác phải được giữ để chắc chắn tất cả user đang sử dụng phiên bản hiện thời ...Thêm vào nữa là khi người dùng phải đồng bộ dl client với máy chủ trung tâm để submit dl, contact có thể bị mất trước khi đồng bộ được hoàn thành vì thế kết quả là không nhất quán.

Tiện ích của thick client: 

Application Service Provider (ASP) vs. Technology Transfer Các nhà cung cấp dịch vụ ứng dụng và chuyển giao công nghệ

Quyết định sử dụng mô hình ASP hoặc chuyển giao công nghệ cho EDC phụ thuộc phần lớn vào chiến lược dài hạn của nhà tài trợ. Các yếu tố quyết địnhThường dựa trên tần suất sử dụng phần mềm (ví dụ: bao nhiêu Nghiên cứu mà nó sẽ được sử dụng) so với chi phí mua vàDuy trì phần mềm.

Application Service Provider

Bản chất ASP là một công ty cung cấp phần mềm của nó cho công ty khác sử dụng có tính phí. Phần mềm đó không được mua mà chỉ có cơ hội được sử dụng nó. Nhà cung cấp  giữ quyền sở hữu phần mềmvà khách hàng phải trả cho nó "per use". Khi một tổ chức sử dụng phần mềm EDC theo mô hình ASP, phần mềm nó sẽ nằm trên phần cứng của nhà cung cấp và dưới thẩm quyển của nhà cung cấp. Khách hàng sẽ truy cập thông qua browser hoặc là phầm mềm khách hàng khác do nhà cung cấp đưa.

Khuyến khích sponsor áp dụng hệ thống EDC sử dụng mô hình ASP, cái mà triển khai, lưu trữ và xác minh phần mềm cũng như nâng cấp hay bảo trì hoặc là hỗ trợ là do nhà cung cấp làm. Một cách tiếp cận dựa trên rủi ro nên được sử dụng để xác định phạm vi vàĐộ sâu của bất kỳ xác nhận phần mềm tài trợ bổ sung để được thực hiện. Cấu trúc về giá của ASP được tính trên tất cả các issues phải được xem xét và bởi vì giá của ASP trên mỗi nghiên cứu thường cao hơn việc chuyển giao một công nghệ hoặc hiểu biết về hệ thống